This was a full interior finish on a trailer. The homeowners' family had done the framing, and I picked it up from there: drywall hung and finished, paint, and flooring throughout. The homeowner was moving up from Texas on a fixed date, and the budget had to stretch across everything else the trailer needed, so there was no slack in either direction.
The weather is what made it hard. It rained through the entire drywall phase and the humidity never broke. Joint compound dries by giving its moisture up to the air, and there was no dry air to give it to, the HVAC could not pull the trailer down far enough against constant rain. Every coat took longer than it should have. That put me at a fork. I could rush the next coat onto mud that was not ready and hit the date clean, and the homeowner would be looking at cracked, shrunken seams inside a year. Or I could let it dry on its own schedule and make the time up elsewhere. I let it dry.
Making up that time meant bringing in help for a few phases and working nights. A friend and I laid most of the flooring in one overnight push the day before the move. The last of it went in while the homeowner was moving furniture in, after paint was done, and the homeowner stayed flexible about that and was happy with the result. I am proud of holding that date without cutting the finish to do it: long hours, help where it made sense, and a house that was ready to live in when the truck pulled up.
Before
Framing and insulation in the trailer's main living area before drywall.Exposed studs and insulation next to the stone fireplace before drywall.Hallway stripped down to the studs, old wall paneling torn away.Framed bedroom with insulation in and lumber staged for the next phase.Gutted living area with the refrigerator staged mid-room during demo.Framed hallway leading to the utility closet and water heater.Framed opening leading to the room with the trailer's side exit door.Framing underway in the main living area, refrigerator staged out of the way.
The Work
Taped and mudded drywall in a bedroom, ready for texture and paint.New drywall finished out in a small closet.Finished drywall around the stone fireplace, supplies staged for cleanup.Taped drywall walls with a ladder set up for the next round of work.Drywall complete in a bedroom, with the hallway and closet doorways finished out.Taped and mudded drywall walls nearing the finished stage.Drywall finished in another room, ladder staged for touch-up work.Finished bathroom with the tub and shower surround installed.Vinyl plank flooring staged over protective paper before installation.Vinyl plank flooring going in through the hallway toward the living room.
Finished
Finished vinyl plank flooring running from the living room into the hallway.Finished flooring with the homeowner's belongings staged for move-in.Finished kitchen with new cabinets, flooring, and appliances installed.Finished living room with new flooring, paint, and the homeowner's furniture moved in.